Painting Walls
We have had two of the walls in the main hall redecorated. The north wall had to be re-plastered to deal with a damp problem. So this needed to be…
Read moreWe have had two of the walls in the main hall redecorated. The north wall had to be re-plastered to deal with a damp problem. So this needed to be…
Read moreWe have had some problems recently with blocked rain water drains, which has caused some rather large ponds outside the front of the hall. This was caused by damage to…
Read moreOn Saturday, 9th November 2019, The Pontiacs returned to Callow End Village Hall for another evening of Rock and Roll with the audience dancing to old favourites. Below is a…
Read moreWe have recently had the electricity distribution panel moved from the Gents toilet to the kitchen. The panel has been positioned so that it is easier to access when necessary.
Read moreNew stage lights have recently been installed in the Village Hall. These are available for use by hall hirers.
Read morehttps://www.worcesternews.co.uk/news/14673021.fete-being-held-to-celebrate-90-years-of-popular-village-hall/
Read more