Toilet Refurbishment Project

Toilet refurbishment works are currently underway. These have taken longer than originally planned. However, the main structural changes have now been made, and the project will be completed soon.

Planned Works

The sketch shows the current layout at the top, and the final new layout, making better use of the available space.